KTNA Studio – Dave Totten, artist

Photo by Deb Wessler

Photo by Dora Miller

KTNA Studio

KTNA On Air Studio, Jan 2013

Photo by Deb Wessler

Photo by James Trump

Fish Lake morning

Fish Lake morning

photo: Robin Song

Archives

New facilities appear in Village Park

by Lorien Nettleton ~ September 14th, 2012

A new addition to Talkeetna Village Park arrived just in time for the last gasps of the tourist season. A two-seater vault toilet has been installed on the west side of the park, adjacent to the current wooden outhouses, which are scheduled to be removed in the coming week. The two-seater toilet had been included in the original park renovation plans that also included park upgrades at Christiansen Lakes Park and Talkeetna Lakes Park.

While numerous people in town have voiced the opinion that two stalls are inadequate to handle the heavy flow of summer-time visitors, the Borough says it still has an 8-unit trailer that will be made available for future seasons while a permanent facility with plumbing and multiple stalls can be arranged.

The Downtown Park is still slated to receive a new and improved pavilion that will be installed north of the current pavilion’s location. The Department of Parks and Recreation has received written approval from the Alaska Rail Road to place the structure on the northern end of the park, which is owned by the Rail Road. It is possible that the new performance pavilion could be in before winter, but it is being held up in the design stage.

1 Response to New facilities appear in Village Park

  1. heather zimmerman

    I am disappointed that it is placed right in the middle of the park. It is unsightly and downgrades Talkeetna’s quaint townsite immensely. Really?

Page optimized by WP Minify WordPress Plugin