> ## Content Index
> Fetch the complete content index at: https://ktna.org/llms.txt
> Use this file to discover other available public pages before exploring further.

# Dam studies: a conversation with the Coalition for Susitna Dam Alternatives
- URL: https://ktna.org/dam-studies-a-conversation-with-the-coalition-for-susitna-dam-alternatives/
- Published: 2012-11-29T09:00:00.000Z
- Updated: 2012-11-29T09:00:00.000Z
- Description: Public comment on the 58 Proposed Study Plans for the Susitna Watana Hydroelectric Dam were filed by November 14th. Coalition for Susitna Dam member Becky Long has reviewed the comments
- Author: GM
- Tags: Local News, #wp, #wp-post, #Import 2026-07-22 01:28

Public comment on the 58 Proposed Study Plans for the Susitna Watana Hydroelectric Dam were filed by November 14th. Coalition for Susitna Dam member Becky Long has reviewed the comments on the proposed studies, and says 41 study plan comments were submitted: 23 from individuals, 10 from Non-Governmental Organizations (NGO), 7 from state and federal government agencies, 1 from Alaska Native Corporation.  
KTNA’s Lorien Nettleton spoke with Long about her findings after reviewing hundreds of pages of comments

[20121129DamRevue](https://ktna.org/wp-content/uploads/2012/12/20121129DamRevue.mp3)

On December 14th the AEA will release the Revised Study Plans, and the final chance for public comment on the Study Plans will be due by January 18th, 2013