Planning Commission Votes Against Waterbody Buffer Setback Changes
At its Monday meeting, the Mat-Su Borough Planning Commission voted unanimously against changes to the waterbody buffer setback requirements. That resolution will be sent to the Borough Assembly. The Assembly’s
At its Monday meeting, the Mat-Su Borough Planning Commission voted unanimously against changes to the waterbody buffer setback requirements. That resolution will be sent to the Borough Assembly.
The Assembly’s proposed changes to the setbacks would allow structures to be built in the 75-foot buffer if they are designed and constructed by a qualified professional. Landowners would be responsible for maintenance of any rain gardens, bio-swales, or other pollution reduction measures.
All members of the public who spoke and wrote expressed opposition to the changes. After hearing comments from the public and the Borough Fish and Wildlife Commission at the previous meeting, the Planning Commission drafted the resolution against the changes.
Approximately 700 structures are in violation of the current setbacks. Enforcement of the legislation and efforts to bring structures into compliance have been challenging. The Planning Commission proposed creating a committee to develop a solution to resolve the issues.
Proposed changes to the waterbody buffer setback requirements will be discussed at the July 18th Borough Assembly meeting.
Read More
Improvements on Mainstreet
On September 30th, the Mainstreet Area Improvement Committee met for the first time since last April to review
Summer Erosion Brings Water Line Work
The project included installing a water valve, removing two fire hydrants, and installing a new hydrant in front of Susitna River Lodge
Backpack Reigns as Alaska's Fattest Bear
The hunt for Alaska’s Fattest Bear has come to an end. A new Fat Bear Week Champion
Susitna Writers Voice September 27th, 2026 - some poems by Corinne Smith
A new episode from Corinne Smith, reading original poems about fall and winter in Alaska and beyond.