The Talkeetna River near Downtown has been at near-flood stage for all of June thus far
Even a casual observation of river levels near the end of Talkeetna’s Main Street will reveal that the water is running high and fast. High levels of erosion near Downtown

Even a casual observation of river levels near the end of Talkeetna’s Main Street will reveal that the water is running high and fast. High levels of erosion near Downtown prompted the Mat-Su Borough to place 500 cubic yards of rock to help shore up the revetment designed to keep the river channel from encroaching into town earlier this month.
River levels are expected to remain high into the weekend. According to measurements from the Alaska Pacific River Forecast Center, the Talkeetna River has crested at near flood stage every day this month. Normal stage for the river is less than ten feet of water. Near-flood or Action Stage is from ten to twelve feet. As of Thursday afternoon, the Talkeetna is expected to reach more than eleven feet on Saturday.
As of Thursday afternoon, the Talkeetna River near where it meets the Susitna and Chulitna, was the only gauge in the state measuring near flood stage.
Read More
AIDEA to Fund West Susitna Access Road Advancement
Twenty five million dollars has just been approved to advance building efforts for the West Susitna Access Road.
Mat-Su Assembly calls for industrial projects at Point MacKenzie, West Susitna; opposes AIDEA transfer
The proposed state plan would gift AIDEA nearly 20,000 acres of state recreation land near Houston.
Hurricane Gulch Bridge to be Refurbished
The Alaska Railroad’s longest bridge over Hurricane Gulch will soon get a much-needed makeover.
Nearly 8,000 Matanuska Electric users have unclaimed cash waiting
MEA members can check an online list to see if they have a waiting payout.