Talkeetna residents to see 50% utility rate hike
A new arsenic treatment system, past capital projects, recent sewer problems that required help of outside contractors have all added up to increased costs for the Talkeetna water utility. The
A new arsenic treatment system, past capital projects, recent sewer problems that required help of outside contractors have all added up to increased costs for the Talkeetna water utility. The Sewer Water Board of Directors has been discussing rate increases for almost a full year, and now, its actually happening. Sue Deyoe has the latest on the water plant operation and the impending rate hike:
[audio:https://ktna.org/wp-content/uploads/2011/06/20110624SewerIncrease.mp3|titles=20110624SewerIncrease]
Read More
KTNA Android App Updated: Rebuilt with Rust, Now with Foldable and Tablet Support
A look at KTNA’s native Android rebuild, with improved listening and foldable and tablet layouts. The Android update is out now!
StarDate Susitna 11-15-26, by Kathleen Fleming
The night sky is definitely happening, even when clouds get in the way. Kathleen Fleming wants you to be ready for the clearing.
MSB Final Election Tally Released
Final results have been announced for the Mat-Su Borough November election. Mat-Su Voters rejected three out
Erosion Mitigation Disaster Funding
The Borough is expected to secure $2 million in federal funds for the planning and design of a comprehensive flood protection system in the downtown area.